第5回
地震荷重によるタンクの座屈に関する研究
著者:
田中 良彦,Yoshihiko TANAKA,高木 愛夫,Yoshio TAKAGI,鈴木 俊一,Shunichi SUZUKI,小川 博志,Hiroshi OGAWA
発刊日:
公開日:
キーワードタグ:
Inspection on Kashiwazaki-Kariwa Nuclear Power Station after the Niigataken Chuetsu-oki Earthquake in 2007 observed obvious buckling in some fluid storage vessels, the filtrate tanks and de-ionized Water tanks. All vessels with buckling belong to Seismic class C. Contrary the other vessels such as Diesel tanks showed no damage. Those phenomena presumably are brought ab out by differences in the vessels' condition (Vessels geometries, Fluid weight, etc.,) and the seismic load on each vessel. In this study, ...
英字タイトル:
Study on Vessels' Seismic Buckling
第2回
知的革新炉実現のための計測融合仮想システム
著者:
内一 哲哉,Tetsuya UCHIMOTO,高木 敏行,Toshiyuki TAKAGI,早瀬 敏幸,Toshiyuki HAYASE,井小萩 利明,Toshiaki IKOHAGI,松岡 浩,Hiroshi MATSUOKA
発刊日:
公開日:
キーワードタグ:
This paper proposes a novel concept of the measurement-integrated virtual system aiming at next-gene ration uclear power plants with intelligent system. The present system is composed of wireless sensor s, a measurement-integrated simulator and a lifecycle simulator. Some element research activities to realize the measurement-integrated virtual system are introduced, and future efforts are overviewed....
英字タイトル:
Ceasurement-integrated virtual system aiming at next-generation nuclear power plants with intelligent system
解説記事
解説記事「連続運転可能な微小差圧吸気型 火山灰除去装置の開発」
著者:
砂川 雅志,Masashi SUNAGAWA,高木 祐,Hiroshi TAKAGI,庄子 哲雄,Tetsuo SHOJI
発刊日:
公開日:
平成 25年 7月に福島第一原子力発電所の事故の教訓や世界の最新知見を踏まえて原子力規制委員会が策定した「新規制基準」が施行された。原子力発電所の再稼働にあたっては、「新規制基準」に従って、テロ対策、過酷事故対策、耐震・耐津波性能の強化、自然現象に対する考慮の新設、電源の信頼性の強化等、幾重にも安全性を確保、維持するためのハードとソフトの対策が要求されている。その対策のひとつが近隣火山の噴火が発生した場合においても炉心の著しい損傷を防止する準備である。泊発電所においては、火山現象時においても炉心損傷防止に必要となる電力供給を安定的にできるよう外気の取入れが必須である大容量の電源設備に対して火山灰除去が可能か検討してきた。本解説では、これまで筆者らが検討してきた省人化に向けた連続運転可能な火山灰除去装置の概念設計および原型試験装置の開発と成果について紹介する。...